The Preliminary Design Approval (PDA) is the first step in Eko Atlantic City’s two-stage planning approval process administered by Eko Atlantic City Management Limited (EACML). It serves as the formal assessment and authorization of a developer’s Concept Design, ensuring that all proposed developments align with the city’s urban design vision, planning principles, and regulatory requirements. The PDA validates that the proposed project conforms to the Lot Regulation Sheet, which stipulates key planning parameters such as plot coverage, setbacks, height restrictions, Floor Area Ratio (FAR), parking provisions, and land-use allocations specific to each plot. Through this stage, EACML ensures that a development is viable, contextually appropriate, and aesthetically compliant before any detailed design work proceeds.
Developers are required to submit a Concept Design Package (referenced in Appendix C of the PABR) that visually communicates the project’s architectural intent, functionality, and site layout. This submission must demonstrate compliance with zoning and planning parameters provided by South Energyx Nigeria Limited (SENL). The EACML technical team then reviews this submission for regulatory and aesthetic compliance, issuing comments or corrections as needed. Developers are allowed up to three design revisions within the initial application fee.
Compulsory Requirements
Tell us so we know what to improve. It takes one click.
Stay Connected